‘Aditya’ High-Speed Rail Complex

News –
- Union Railway Minister Ashwini Vaishnaw inaugurated the ‘Aditya’ High-Speed Rail Complex at the BEML Thippasandra campus in Bengaluru.
‘Aditya’ High-Speed Rail Complex
- It is a state-of-the-art manufacturing facility in Bengaluru established by BEML
- Mandate – to build India’s first indigenous bullet train,
Key Project Details
- Location: BEML Thippasandra Campus, Bengaluru.
- Flagship Project: The B-28 high-speed trainset, designed in collaboration with the Integral Coach Factory (ICF).
- Capabilities:Features advanced robotic laser welding and universal hydraulic jigs.
- Production targets an operational speed of 250km/hr.








Leave a Reply